Luling Water Treatment Plant Division
Luling Water Treatment PlantUnder water rights permits issued by the State of Texas, the GBRA Luling Water Treatment Plant is capable of diverting up to 4,422 acre-feet of water annually from the San Marcos River near Luling, providing a reliable source of municipal water treatment and delivery to the City of Luling and to the City of Lockhart.
With a peak rate treatment capacity of 2.5 million gallons per day, division staff utilizes technology and equipment to achieve efficient and cost-effective plant operations. The plant is manned around the clock to ensure that treated water meets all required standards for public water facilities. This plant is a past winner of the U.S. Environmental Protection Agency Region 6 "Environmental Excellence Award for Public Water Supply".
  • Location: Luling, Texas
  • Startup Date: July 5, 1978
  • Capacity: 2.5 mgd
  • Service Area: City of Luling / City of Lockhart
  • Service Population: 16,695
Contact
Joe Downey, Plant Manager
Phone: 830-875-2132
Fax: 830-875-3670
E-mail:
CURRENT FLOW & LAKE DATA        (more...)
(+/-0.00) - indicates change in 24 hours
J-17 Well: 669.4 msl (+1.7)
Canyon Reservoir 904.30 msl (+0.10)
Guadalupe @ Sattler 209 cfs (+0)
Comal Springs 274 cfs (+4)
San Marcos Springs 125 cfs (+0)
Guadalupe @ Gonzales 909 cfs (+296)
Guadalupe @ Victoria 576 cfs (+14)
Coleto Reservoir 95.74 msl (-0.02)
Guadalupe @ Tivoli 989 cfs (+119)

RESOURCE LIBRARY (more...)
Canyon Gorge
Canyon Reservoir Fact Sheet
Annual Reports
GBRA River Run
Maps
Reports and Studies
Links

CONSERVING A TEXAS TREASURE
Guadalupe RiverThe Guadalupe-Blanco River Trust was founded in 2001 to conserve land in the Guadalupe River Watershed.
Learn more...