Canyon Dam Inspection, No River Flow Wednesday

Posted: June 11, 2018

For more information
Ja Nise Solitaire, (830) 379-5822,

SEGUIN—The U.S. Army Corps of Engineers (USACE) plans to inspect Canyon Dam and associated flood control structural components Wednesday, June 13, 2018. In order to perform the conduit and flood gate inspections, the Guadalupe River flow will be cut off from 8 a.m. to 7 p.m. The USACE plans to complete the inspection on Wednesday, but there is a possibility that additional time in the conduit may be required on Thursday. We appreciate the patience and understanding of those impacted by the cut off river flow, as the required inspection is being conducted. 

To stay updated on the river flow, go to gbra.org and click on conditions to access the streamflow data map.

GBRA was established by the Texas Legislature in 1933 as a water conservation and reclamation district. GBRA provides stewardship for the water resources in its 10-county statutory district, which begins near the headwaters of the Guadalupe and Blanco rivers, ends at San Antonio Bay, and includes Kendall, Comal, Hays, Caldwell, Guadalupe, Gonzales, DeWitt, Victoria, Calhoun, and Refugio counties. GBRA provides services that include hydroelectric generation; water and wastewater treatment; municipal, industrial, and agricultural raw water supply; and recreational operations.

-30-

© 1998 Guadalupe-Blanco River Authority

Home | Contact Us

Like "GBRA of Texas" on Facebook

Follow @GBRATX on Twitter

Follow @GBRATX on Instagram

GBRA Social Media Comments Guidelines